Technical Bulletins

The technical bulletins below provided updates to the 2006 version of the Design Guidelines & Construction Standards.  

Technical Bulletin #    
Date Issued     Subject
 
30-2010 January 5, 2010 Site Security - Verified Video Surveillance
     
29-2009 December 15, 2009 Heat Treatment Room for Bed Bugs
     
28-2009 October 5, 2009 SGC to Stipulated Price Contract CCDC2 - Section 11 Insurance
     
27-2009 September 14, 2009 Carpet
     
26-2009 September 14, 2009 Ceramic Tile
     
25-2009 July 16, 2009 Closeout Submittal - Digital As-Built Record
     
24-2009 July 6, 2009 Section 2 Design Guidelines - Finishes, Materials and Systems, 4.1 Finishes
     
23-2009 July 6, 2009 Resilient Flooring
     
22 -2009  June 26, 2009 Proposed Fire Alarm System with Combined Smoke/Heat (rate of rise) Detector          
     
21-2009 June 15, 2009 Aluminum Alloy Conductors for Distribution Feeder Applications
with Recommendations for Connections
     
20-2009 May 21, 2009 Section 3 Energy Performance
     
19-2009 April 22, 2009 ASHRAE Standard 62.2 – Suite Ventilation –
Environmental Tobacco Smoke Control
     
17-2008 July 30, 2008 Supplementary General Conditions to the CCDC2 2008
     
16-2008 March 18, 2009 ASHRAE Standard 62.2 – Ventilation for acceptable indoor air quality
     
15-2008 February 5, 2008 SGC to Stipulated Price Contract CCDC2 - Part 5 Payment -
GC 5.4 Substantial Performance of the Work
     
09-2005 January 12, 2005 Exemption from Homeowner Protection Act Requirements
     
07-2004 June 10, 2004 Professional Liability Insurance
     
02-2003 July 23, 2003 Elevators
     
01-2003 April 10, 2003              Section 01240 - Evaluation of Alternatives